Field-tech checklist
Assessment checklist
The same checklist our field technicians run through on every SureTrace engagement. Use it on screen before mobilization, then print a copy for the truck and tick it off in the field.
Printable PDF template
The reusable framework template (scope, deliverables, pricing, and a blank printable checklist) is available as a PDF for the kick-off binder or the truck.
Google-Docs editable copy
Open the companion
framework-template.html, then File → Save as Google Doc. Edits stay editable while the markup preserves headings, tables, and checklist formatting on import.Walk the checklist
On-screen, before the field team leaves the office
Tick the items already confirmed, reset between engagements, and print the PDF for the field. State is kept on this device only; nothing is uploaded.
Assessment progress0%
0 / 20 confirmed
1. Pre-field preparation
Before the GPR or EML comes out of the truck.
0 / 5
2. Geophysical sweep (GPR / EML / RF)
On the ground, working systematically across the footprint.
0 / 5
3. Mark-out + survey
Translating detection into something the project team can use.
0 / 4
4. 811 vs private demarcation
Closing the gap between public-ticket obligations and private findings.
0 / 3
5. Deliverables confirmation
Closing the engagement cleanly.
0 / 3